Monday, August 4, 2014
SQ14 Piston
Monday, July 28, 2014
SQ14 Slider Injector Valves
Hours:
Week: 80
Total: 800
Tuesday, July 15, 2014
SQ14 Rebuilding Engines
While I was in the job in Poland the ship was getting a lot of other work done by the ship yard. Here are some of the pictures from some of the work they were doing.
After work we got to walk around GdaĆsk, Poland and see some of the things close to our hotel. I will put up a few photos of Poland too.
Hours:
From last blog: 400
Total: 720
Wednesday, June 18, 2014
SPQ14 Tans Marine
This week i started work at trans Marine. They work on big ship engines around the world. Right now I am in Poland working on a oil tanker ship. We are doing a rebuild of fuel pumps, heads, water jackets, and liners.
Week:75
Total:320
Monday, June 2, 2014
SPQ14 ECT sensor
Thursday, May 15, 2014
SPQ14 CAT 3516
This week I have stayed really busy working on a CAT 3516. I have been doing a power pack on one of the cylinders. I learned a lot on how to measure certain items inside the engine and also how to use the measuring instruments correctly. I have found many issues with the engine I am been working on. I feel confident now measuring items inside the engine and knowing that I have the correct measurement.
Hours:
Week: 50
Total: 250
Tuesday, May 6, 2014
SPQ14 Engines
This week we started working on engines in class. We took apart a John deer engine that had a hole in the side of it. We took it apart looking for the failure and what we found was not what we were expecting. We all made guesses and most of them were for a connecting rod. In the end we found out that it was the balancing shaft that failed and we used failure analysis to find out that one of the balancers came loose. That caused extra wear on the shaft and caused the failure.
Hours:
Week: 50
Total: 200
Monday, April 21, 2014
SPQ14
This week we went deeper into diodes. We started exploring how a diode work and why it only travels in one direction. I have learned a lot on how the diode works internally and that has helped me to better understand what happens when they fail. Here is a video that helped me understand diodes.
http://m.youtube.com/watch?v=JBtEckh3L9Q
Hours:
Week: 50
Total: 100
Tuesday, April 15, 2014
SPQ14 Electrical Boards
This week we started back into electrical systems in class. We are working on shorts, relay systems, voltage drops, and open grounds. It is great getting back to electrical and refreshing my skills.
Hours:
Week: 50
Total: 50
Wednesday, April 9, 2014
SPQ14 Fuel Pumps
This week I started back in class at school. I have started to learn about fuel injection pumps. I took apart a Bosch single-plunger fuel injection pump. I learned how simple these pumps can be and the many different types of pumps.
Monday, March 24, 2014
WQ13 Bobcat Tilt
This week I learned about the pins that allow you to tilt the bucket on a Bobcat. The pins on the Bobcat are tapered. You fill behind it with grease and then pull tight with the bolt and that's what it pivots on.
Hours:
Week:40
Total:290
Monday, March 17, 2014
WQ13 sweeper
This week I worked on a sweeper that needed adjustment and hydrolic lines. Two of the inside lines were cracked and fraying.
Hours:
Week:40
Total:250
Thursday, March 13, 2014
WQ13 Nomadic Oiler
This week I learned about the oiling system for a air hammer. The Oiler system goes in the line just before the air hammer and as air pushed through small opening at the bottom of the oil reservoir allows the oil to be sucked in to the air system.
Hours:
Week:40
Total:210
Wednesday, March 5, 2014
WQ13 Preventive Maintenance
This week I have been working on preventive maintenance. I wash and re-grease all of the rental equipment as it comes back in. During this process I am looking for any cracks or dents in the equipment.
Hours:
Week: 40
Total: 170
Tuesday, February 25, 2014
WQ13 Pape
This week I found work at pape rental equipment. I have been trained to operate many different peaces of equipment and there safety practices.
Hours:
Week: 40
Total: 130
Wednesday, January 29, 2014
WQ13 Interview
This week I had an interview with PAPE to be a forklift technician. They would train me for the position as a backup/helper for the other mechanics.
Hours:
Week: 10
Total: 50
Wednesday, January 22, 2014
WQ13 Job Hunting
The past few weeks I have been applying for jobs at many different companies.
Hours:
Week: 20
Total: 40