Tuesday, November 26, 2013
FQ13 Air Brakes
Friday, November 8, 2013
FQ13 Wheel Bearings
Hours:
Week:50
Total:409
Monday, November 4, 2013
FQ13 chains
Week:50
Total:359
Monday, October 28, 2013
FQ13 Load Sensing
This will I learned about the shuttle valve that controls the pressure change to the main valve. There was a bad o'ring for that valve so the pressure was staying at idle and not going up causing the processor it's in to not feed logs.
Hours:
Week:60
Total:309
Tuesday, October 22, 2013
FQ13 Electronic Brake Booster
This week I have learned a lot about electronic brake boosters and the way they work. I put together a electronic brake boosters that runs of the main reservoir of ATF for the entire machine. The machine is a champion grader that has a electronic brake booster that goes into the normal booster in case of engine shut off. It's amazing how simple the designee of the system is and how well it works.
Hours:
Week: 70
Total: 249
Monday, October 14, 2013
FQ13 Parisitic Draws
Hours:
Week: 64
Total:129
Tuesday, October 8, 2013
FQ13
This week I have learned a lot about 6.0l ford engines, put together tracks on a yarder, and troubleshoot a relay that controls the fuel injection system for start up and shut down. I have also learned how to take apart a excavator boom and get it ready for line boarding.
Hours:
Week:65
Total:65
